News Center
Name of the clean production audit consulting service agency: Zibo Kangyuan Environmental Protection Technology Co., LTD
Reviewers: Bi Jungang, Chen Juan, Li Lijuan, Li Lei, Cui Yuan, Zhou Jian
To enhance the company's economic benefits and reduce pollutant emissions, our company has fully launched the clean production audit work since May 2020. At the same time, we have entrusted Zibo Kangyuan Environmental Protection Technology Co., Ltd. to provide technical and methodical guidance for the audit work. In accordance with the "Clean Production Promotion Law of the People's Republic of China", the "Measures for Clean Production Audit" (Order No. 38 of the National Development and Reform Commission and the Ministry of Environmental Protection), and the "Detailed Rules for the Implementation of Clean Production Audit in Shandong Province", we are now publicly disclosing the basic situation of our company as a clean production enterprise and the status of production and pollutant discharge. We sincerely invite all sectors of society to supervise the implementation of clean production audit by our company. I. Basic Information of the Enterprise: Company Name: Shandong Longxin Pharmaceutical Co., LTD. \ nIndustry: Active Pharmaceutical Ingredient Manufacturing Enterprise type: Private \ nLegal Representative: Bi Fangtian District and County: Linzi District Address and Postal Code: No. 299, Ethylene Road, Linzi District Telephone and fax: 7968001 contact: manager wang Main product production capacity: 20,000 tons/year of salicylic acid series products, 20,000 tons/year of methyl salicylate
Ii. Main Raw Materials and Quantities:
Iii. Main Pollutants, Their Discharge Volumes and Discharge Standards:
Wastewater discharge execution standard: Received standard by Sinopec Qilu Branch (Water Supply and Drainage Plant) Exhaust gas emission implementation standard: Volatile Organic Compounds Emission Standard - Part 6: Organic Chemical Industry DB37/2801.6-2018 \ nNoise implementation standard: - "Emission Standard of Environmental Noise at the Boundary of Industrial Enterprises" (GB12348-2008) Solid waste execution standard: __ "Pollution Control Standards for Storage and Disposal Sites of General Industrial Solid Waste" GB18599-2001; The hazardous waste shall comply with the "Pollution Control Standard for Hazardous Waste Storage" (GB18597-2001) Iii. Storage and Disposal of Hazardous Waste: A 500-ton hazardous waste storage facility has been built, and all hazardous waste has been transferred in accordance with relevant regulations. Iv. Environmental Risk Prevention and Control Measures: (1) Prepare environmental emergency response plans. (2) Around the storage tanks and production areas, cofferdams are set up, which can effectively isolate the leaked substances. (3) Three 80 cubic meters emergency pools have been built, which can temporarily store the accident wastewater.
|
Application Form for Clean Production Audit Assessment and Acceptance of Key Enterprises
Enterprise name |
(Official Seal) |
|||||||||
Enterprise type |
The first category () The second category () Others () |
|||||||||
Correspondence address |
|
Postal code |
|
|||||||
Legal representative |
|
Form fillers |
|
Telephone call |
|
|||||
Enterprise nature |
|
Industry to belong |
|
|||||||
Main raw materials |
|
|||||||||
Main products |
|
|||||||||
Main pollutants |
Name |
|||||||||
Discharge methods, destinations, and concentrations |
||||||||||
Total emissions |
||||||||||
Implement the emission standards and the prescribed total limits |
||||||||||
Review time |
Year month day - Year month day |
|||||||||
Consulting agency |
(Official Seal) |
|||||||||
Correspondence address |
|
Postal code |
|
|||||||
Project Leader |
|
Telephone call |
|
|||||||
Whether the technical equipment complies with the national industrial adjustment and industry policies |
|
|||||||||
During the review period, was there any pollution accident that was investigated and dealt with by the environmental protection department |
|
|||||||||
Clean production plan |
No/low-cost plan: generated, completed |
|||||||||
Medium/high-cost plans: generated and completed |
||||||||||
Implement the "three simultaneous" situation |
|
The operation status of environmental protection facilities |
|
|||||||
Whether there were any pollution accidents during the review period |
|
|||||||||
Preliminary review opinions of the district and county ecological environment departments |
All rights reserved © 2022 Shandong Longxin Holding Group Co., LTD. All rights reserved. Lu ICP No. 11032581-1 Official website construction: Xiangyun Platform